What should be checked before drafting?
Read the tender's actual counting rule, including whether headings, tables, footnotes or attachments count. Do not assume an attachment is excluded or that a linked document will be evaluated. Put ambiguous counting instructions into the clarification process.
The Australian Department of Finance's Building Your Best Tender Response material, published in April 2025, is a preparation resource for suppliers responding to government opportunities. The worksheet on this page is an original editorial aid for engineering tenders; it does not replace a particular buyer's response instructions.
Sources: Australian Department of Finance: Building Your Best Tender Response, April 2025
How can a word budget preserve the proof?
Use the question's criteria as the outline. For each criterion, choose a claim you can support, its evidence reference and the part of the answer where that reference belongs. Do not create a company credential or project example to fill an empty evidence row.
| Answer component | Illustrative budget | Evidence discipline |
|---|---|---|
| Direct answer | 40 words | State the proposed approach without an unsupported claim |
| Delivery method | 100 words | Describe roles, review stages and actual deliverables |
| Supporting evidence | 100 words | Identify authorised proof and its relevance |
| Limitations and interfaces | 40 words | Make dependencies explicit |
| Closing commitment | 20 words | Use only an approved, supportable commitment |
How should the budget be used?
Illustrative example. A fictional tender asks how the bidder will control electrical drawing revisions, with a 300-word limit. The five allocations above sum to 300. The writer reserves 100 words to identify authorised evidence, rather than spending the entire limit on a generic description of quality.
If no authorised past-project evidence is available, describe the proposed revision-control deliverable honestly and flag the evidence gap to the bid owner. Do not label a proposed method as a proven result. A process diagram prepared for the bid is not a client testimonial.
The allocations are not a fixed formula. Move words to match the actual question and weighting. A question focused on experience may need more space for evidence; one focused on a proposed method may need more explanation of the work.
What can be cut without weakening the answer?
Remove repeated claims, generic company introductions already requested elsewhere and adjectives that add no verifiable information. Replace vague promises with the concrete output, its reviewer and the control that makes it useful.
Keep evidence references specific enough to locate. Check permission before naming clients or projects; this site does not publish confidential project details. Use an approved anonymised description only where the tender accepts it and the operator has authorised it.
Count the final answer using the buyer's rule, then review every criterion against the submitted version. A later shortening pass can accidentally delete the only sentence that answers part of the question. Keep the final evidence map with the approved submission.
Common questions
What else should the bid team know?
Can a table bypass a word limit?
Only if the tender instructions explicitly permit that treatment. Do not assume it.
What if proof cannot fit?
Prioritise the evidence relevant to the criterion and use authorised references only as permitted by the tender.
Can a proposed method be presented as past experience?
No. Distinguish proposed work from verified past performance.